Previous - Subsequent
74cm / 29" available in the garage. Minus 1" for clearance and ½" each for wood and end pieces, that's 26" rails. Work should recommence tomorrow (Fri 11th).
I am considering reducing the depth of one of the desk shelves to make patching easier. It's a shame to interfere with a work of art, but so it goes.
[11 Sep] The first stages of the three units have been built and are looking good.
Next, consider the power supplies. I have one Doepfer unit for the main box. I'll first plunder the existing setups for Zeuses, as I imagine the garage and top rail will use three of those.
No comments:
Post a Comment